5-YEAR STRATEGIC PLAN FOR CAVITE STATE UNIVERSITY –
TANZA | TRECE MARTIRES CITY | GENERAL TRIAS CITY CAMPUSES (FY 2018-2022)
Strategic Goal: “For a bigger, better and self-sustaining T3 Campuses”
A. CAMPUS DEVELOPMENT
STRATEGIC AREA FY 2018 FY 2019 FY 2020 FY 2021 FY 2022
Trece Martires City • Transfer to the permanent 1 ha. • Design & Approval of 2- • Construction of 2-storey • Conversion of old 2- • Construction of 5-storey
Campus campus site storey and 5–storey building (P16M) storey building to BSHM building to accommodate
buildings Hostel, Business 5,000 students (P50M)
Area: 10,000 sq.m. • Renovation of donated 2-storey • Establishment of new BSIT Entrepreneurial Building
temporary building • Construction of access Laboratory and bigger and Campus Canteen • Construction of students’
road (P5M from LGU) Campus Library (P1M) (P2M) kiosks (P0.5M)
• Construction of a covered • Construction of perimeter • Complete campus
court with stage (P7M) fence and retaining landscaping (P100K)
campus walls (P5M)
• Construction of gate and
guard house (P0.5M)
Tanza Campus • Acquisition of permanent land • Renovation and • Construction of 2-storey • Establishment of new • Construction of more
ownership from NHA/LGU upgrading of existing building to accommodate BSIT Laboratory (P0.2M) classroom facilities to
Area: 1000 sq.m. building facilities for 1,000 students (P2M) accommodate 2000
• Acquisition of additional areas faculty, library, and BSIT • Establishment of bigger students (P5M)
for campus expansion laboratory (P1M) • Construction of gate and Campus Library (P0.5M)
covered pathway (P0.5M)
• Adoption of “vertical
development” as strategy for
campus development
Gen. Trias City Campus • Acquisition of additional building • Renovation of acquired • Negotiation and planning for • Acquisition of permanent • Development of the
for classrooms, faculty room, building and a new and permanent CvSU campus site for a bigger permanent campus site
Area: 1000 sq.m. laboratory and library (through establishment of new Gen Tri Campus site to student population to accommodate 5,000
LGU) classrooms, faculty room, increase students’ (through LGU) students (through
BSIT Laboratory and enrollment/population. sharing scheme between
Library (P0.1M) LGU and CvSU)
• Renovation of building
rooftop for BSHM/Tourism
facilities (P0.2M through
LGU)