                         1  Choose a Materials List Report      • Select Buy List to calculate framing
                            Method. The selected method will      materials by counting individual pieces
                        affect subsequently created Materials Lists,   and matching them to items in the list of
                        but not any that may already exist.       Buy List Board Sizes, below.
                        • Select Mixed Reporting to calculate   • Check Consolidate Unhandled Boards
                           framing materials using a combination of   to handle short board segments by com-
                           lineal lengths and piece counts.       bining them so they can be cut from
                        • Select Total Lineal Length to calculate   lengths found in the Buy List Board
                           framing materials in linear feet.      Sizes list. When this is checked, three
                                                                  additional options are available:
                        • Select Cut List to calculate framing
                           materials by counting the individual   • Check Assemble Wall Plates to handle
                           pieces present in the model.           wall plates using board sizes from the
                                                                  table below.