Page 878 - Chief Architect Reference Manual
P. 878

Chief Architect X10 Reference Manual



                           •  As they are drawn, roof trusses will   new locations. As a result, replicated Roof
                             snap to any walls that they cross.   Trusses and their labels may be different
                           •  When a roof truss ends over an exterior   from the original. See “Truss Labels” on
                             wall, it will extend into the roof eave,   page 882.
                             stopping at the inside edge of the Eave   Unlike Roof Trusses, Floor/Ceiling Trusses
                             Sub Fascia.                        do not conform to new structural conditions
                           •  Floor/Ceiling trusses will snap to the   when they are either moved or copied. See
                             wall surfaces, the exterior surface of a   “Moving Trusses” on page 880.
                             wall’s Main Layer, as well as to a vari-
                             ety of CAD-based objects, and can be   To replicate trusses using Multiple Copy
                             drawn to any length.
                                                                1.  Select the truss to be copied in floor plan
                        2.  Reposition the truss:                  view.
                           •  Floor/ceiling trusses are often posi-
                             tioned relative to an exterior wall or   2.  Click the Multiple Copy    edit
                                                                   button.
                             Framing Reference Marker   . See
                             “Framing Reference Markers” on page   3.  Click the Multiple Copy Interval
                             858.                                  edit button to open the Multiple Copy
                           •  Roof trusses are can be positioned over   dialog. See “Multiple Copy” on page
                             a gable end wall or at the ridge end of a   179.
                             hip.                               4.  Enter the correct spacing in the All
                        3.  Open the truss’s specification dialog and   Trusses box. Once set, click OK.
                            edit its settings to meet your needs. See   5.  Select the truss and use the Move edit
                            “Roof Truss Specification Dialog” on   handle to drag it perpendicularly. The
                            page 892 or “Floor/Ceiling Truss Speci-
                            fication Dialog” on page 895.          pointer becomes a four-headed arrow
                                                                   when it is over the Move handle.
                        4.  Make multiple copies of the truss at
                            specified intervals using the Multiple   6.  New trusses appear as you drag. Drag as
                                                                   far as necessary to produce all desired
                            Copy    edit tool.                     trusses. Each truss is created according
                        The copies of Roof Trusses automatically   to the particular Roof/Ceiling/Truss
                        conform to the structural conditions in their   Base planes above and below it.


                   Displaying Trusses

                             The display of trusses and their labels   Truss labels display in floor plan view, cross
                             is controlled in the Layer Display   section/elevation views, and the Truss Detail,
                        Options dialog. See “Layer Display Options   and are used in the Materials List. See “Truss
                        Dialog” on page 190.                    Labels” on page 882.




                   878
   873   874   875   876   877   878   879   880   881   882   883