Welch Hall Stage B

        LOCATION: Austin, TX
        OWNER: University of Texas
        GENERAL CONTRACTOR: The Beck Group

        CURRENT CONTRACT VALUE: $10.3M

        The bulk of this project consists of the renovation of raised
        floor chemistry labs, auditoriums, collaborative spaces and
        administrative spaces. The project also involves replacing a
        15KV Medium Voltage substation that feeds Welch Hall and
        the surrounding buildings on campus. The building is made
        up of three (3) separate structures that were built in 1929,
        1961, and 1978. The coordination and integration of all the
 Contra Costa County Administration Buildingontra Costa County Administration Building  buildings and systems is the largest challenge on the project.
 C
        Rosendin's scope includes electrical, telecommunications,
 LOCATION: Martinez, CA  and fire alarm.
 OWNER: Contra Costa County
        The project will support the engineering and chemistry
 GENERAL CONTRACTOR: Hensel Phelps  students at the University of Texas and be the home to many

 CURRENT CONTRACT VALUE: $15.4M  student groups and organizations.

 Rosendin was part of the team for the new Contra Costa County Emergency Operations Center. The two-story, 38,000
 square foot building includes a training lecture hall and serves as a planning and media center for the sheriff’s
 department. The building also provides breakout conference rooms, a situation room to monitor all emergencies in the
 area including COVID-19 issues, a fitness area, and office space to accommodate the sheriff’s operations. A major feature
 of its design is its ability to operate independently for up to a week if a natural disaster or crisis event occurs that
 dismantles the city’s utilities or requires an emergency assembly.





                                             V
                                             VA Outpatient ClinicA Outpatient Clinic

 ABIA Consolidated                           LOCATION: Phoenix, AZ
 Maintenance Facility                        OWNER: U.S. Federal Properties, Co.
                                             GENERAL CONTRACTOR: Jacobson Construction
 LOCATION: Austin, TX                        CURRENT CONTRACT VALUE: $11.8M
 OWNER: Austin-Bergstrom International Airport
 GENERAL CONTRACTOR: J.E. Dunn               At 275,157 square feet, the new Phoenix facility will be one of the largest
                                             VA outpatient clinics in the U.S., with more than half a million visits per year
 CURRENT CONTRACT VALUE: $5.9M               anticipated. The five-story clinic will include multi-specialty and telehealth
                                             clinics, an education center, pathology, and imaging. A full kitchen and canteen
 Rosendin is helping to construct a new LEED Silver   for staff and patients will be on the first floor. The second floor will house
 consolidated maintenance facility on 16 acres northeast of   one of the largest outpatient mental health clinics in the valley, providing
 the Austin airport. The new facility will provide maintenance   counseling and specialty mental health services. Floors three, four, and five
 support to the main airport daily operations and include   will feature an innovative planning approach for the PACT module, which
 maintenance headquarters, motorpool, warehouses, trades,   will accommodate 72 PACT teams serving approximately 180 exam rooms.
 recycling, truckwash, garages, several canopies and the   The clinic design also emphasizes technology-based care including remote
 Airport Police Department, as well as a De-Icing equipment   diagnostics and telehealth to serve patients from their homes or other clinic
 storage building.                           sites. Electronic self-check-in and mobile check-in are among the technology-
                                             centered amenities incorporated into the design. Rosendin's team is working
                                             on the special low voltage systems.