Page 22 - CV April-May 2019 issue
P. 22

Build Faster than Brick/Block work!







        S      ay bye to brick/block work with Everest Smart walls. A   ·   Room to Bathroom partition
                                                                        Room to Kitchen partition
                                                                    ·
               blend of hollow drywall and solid partition, Everest Smart
               walls  are  non-load  bearing  partition  walls,  an  ideal   Everest provides complete building solution from designing the
                                                                 project, planning service details, supplying material, ensuring site
        alternative for conventional masonry.
        These sleek walls are three times lighter than brick/block, faster   erection to final guidance in surface finishing.
                                                                 Make a smart choice with Everest Smart walls, the future way to
        to erect with 30% less construction time. A perfect fit for the quick
                                                                 build.
        pace of contemporary design, Everest Smart walls can last a
        lifetime of a building (until subjected to abuse).
        Made with special fibre cement boards, these walls
        have  a  pre  finished  surface  that  does  away  with
        plastering and POP activities.
        Everest Smart walls can be used as dividers in building  ‘30% faster and easier than Brick/Block work’
        interiors regardless of location, in both dry and wet
        areas, unlike other drywalls. More importantly, these
        allow you to build without the annoyance of chiseling
        as seen in brick/block work.

        Why SMART?
            ·   Saves space with slim sections
            ·   Saves  water  with  90%  less  water
               requirement
            ·   Saves  money  with  high  impact  resistance
               walls
            ·   Saves time with Pre finished surface
            ·   Saves manpower with less labour
            ·   Saves  electricity  with  excellent  thermal
               insulation.
            ·   Saves  environment  with  reduced  carbon
               footprint
        Areas of Application
            ·   High Rise Buildings
            ·   Room to Room partition

         20 / CONSTRUCTION VISION / May June 2019
   17   18   19   20   21   22   23   24   25   26   27