Page 22 - CV April-May 2019 issue
P. 22
Build Faster than Brick/Block work!
S ay bye to brick/block work with Everest Smart walls. A · Room to Bathroom partition
Room to Kitchen partition
·
blend of hollow drywall and solid partition, Everest Smart
walls are non-load bearing partition walls, an ideal Everest provides complete building solution from designing the
project, planning service details, supplying material, ensuring site
alternative for conventional masonry.
These sleek walls are three times lighter than brick/block, faster erection to final guidance in surface finishing.
Make a smart choice with Everest Smart walls, the future way to
to erect with 30% less construction time. A perfect fit for the quick
build.
pace of contemporary design, Everest Smart walls can last a
lifetime of a building (until subjected to abuse).
Made with special fibre cement boards, these walls
have a pre finished surface that does away with
plastering and POP activities.
Everest Smart walls can be used as dividers in building ‘30% faster and easier than Brick/Block work’
interiors regardless of location, in both dry and wet
areas, unlike other drywalls. More importantly, these
allow you to build without the annoyance of chiseling
as seen in brick/block work.
Why SMART?
· Saves space with slim sections
· Saves water with 90% less water
requirement
· Saves money with high impact resistance
walls
· Saves time with Pre finished surface
· Saves manpower with less labour
· Saves electricity with excellent thermal
insulation.
· Saves environment with reduced carbon
footprint
Areas of Application
· High Rise Buildings
· Room to Room partition
20 / CONSTRUCTION VISION / May June 2019

