Page 175 - Facilities Master Plan 2016
P. 175
• More parking is needed
• A larger cafeteria is needed
• The leaks at portables 8 and 9 need to
be repaired
Notes from Maintenance & Operations:
• Common areas (restrooms, libraries,
etc.) need specialized access control
• More custodian storage
• Dumpster enclosures for 4 dumpsters
• New emergency lighting battery backup
system
• Portables may need siding repaired
• Re-roof portables
375 Culbertson Drive, Lodi, CA 95242
EXISTING SITE INFORMATION CONDITION ASSESSMENT
Year Built: 2004 Recently Completed Work:
Site Acreage: 11.3 acres
• N/A
Student Population (2014-2015): 851
Grade Levels: K-6
Notes/Comments from School Site:
Total Number of Classrooms: 35
Number of Portables: 2 • A secure entry to campus is needed
• Additional classrooms are needed
• Repair vinyl in restrooms (currently pulling
away from wall)
• New locksets are needed at the restrooms
near the kitchen
5.22 EXISTING CONDITIONS ASSESSMENT Facilities Master Plan 176
LOIS E. BORCHARDT ES Lodi Unified School District