Page 221 - Facilities Master Plan 2016
P. 221

Notes/Comments from School Site:


                                                                                                        •  Fencing for security is needed
                                                                                                        •  Concrete walkways need to be repaired     All images taken by LPA.
                                                                                                            and/or replaced where tree roots have
                                                                                                            caused damage and created tripping
                                                                                                            hazards
                                                                                                        •  Additional capacity is needed, including
                                                                                                            additional restrooms
                                                                                                        •  Administration needs to be expanded
                                                                                                        •  A music classroom is needed
                                                                                                        •  A band classroom is desired
                                                                                                        •  A computer lab is needed
                                                                                                        •  Larger RSP and speech rooms are
                                                                                                            needed
                                                                                                        •  Additional staff restrooms are needed
                                                                                                        •  Fields need to be regraded



                                                                                                        Notes from Maintenance & Operations:

        1100 N. Ham Lane, Lodi, CA 95242                                                                •  Replace all portable ramps/stairs
                                                                                                        •  Interior and exterior painting and flooring
        EXISTING SITE INFORMATION                        CONDITION ASSESSMENT                           •  Common areas (restrooms, libraries,
                                                                                                            etc.) need specialized access control
        Year Built: 1965                                 Recently Completed Work:                       •  More custodian storage
        Site Acreage: 10.4 acres                                                                        •  Dumpster enclosures for 4 dumpsters
                                                         •  New carpet was installed in Rooms 21 and 22  •  Upgrade EMS
        Student Population (2014-2015): 580              •  Water leak damage in Room 4 was fixed       •  Replace water main valves and all
        Grade Levels: K-6                                •  Refurbished south wall in Room 5 due to mold    plumbing fixtures
                                                         •  Refurbished restroom in transitional        •  Needs asphalt overlay at parking and
        Total Number of Classrooms: 23                      kindergarten pod                                playgrounds
        Number of Portables: 3                           •  Refurbished restroom in kitchen/cafeteria   •  Remove 8 trees
                                                                                                        •  Needs irrigation automation








        5.30       EXISTING CONDITIONS ASSESSMENT                                                                              Facilities Master Plan  219
                   LAKEWOOD ES                                                                                             Lodi Unified School District
   216   217   218   219   220   221   222   223   224   225   226