Page 227 - Facilities Master Plan 2016
P. 227

•  Students are accessing the roof due to
                                                                                                           the low building canopies; a solution to
                                                                                                           prevent this is needed
                                                                                                        •  Need a raised stage in the MPR            All images taken by LPA.



                                                                                                        Notes from Maintenance & Operations:
                                                                                                        •  Common areas (restrooms, libraries,
                                                                                                           etc.) need specialized access control
                                                                                                        •  More custodian storage
                                                                                                        •  Dumpster enclosures for 4 dumpsters
                                                                                                        •  Replace drinking fountains in classrooms
                                                                                                        •  Re-roof throughout










        2375 Giannoni Way, Lodi, CA 95242

        EXISTING SITE INFORMATION                        CONDITION ASSESSMENT

        Year Built: 2005                                 Recently Completed Work:
        Site Acreage: 13.75 acres
                                                         •  N/A
        Student Population (2014-2015): 740
        Grade Levels: K-6
                                                         Notes/Comments from School Site:
        Total Number of Classrooms: 35
        Number of Portables: 0                           •  Additional classrooms are needed to address
                                                            the growing population
                                                         •  A shade structure is needed
                                                         •  Traffic flow during pick-up in the main parking
                                                            lot is challenging; cars line up in the street
                                                            and conflict with the bus traffic pattern


        5.31       EXISTING CONDITIONS ASSESSMENT                                                                              Facilities Master Plan  225
                   ELLERTH E. LARSON ES                                                                                    Lodi Unified School District
   222   223   224   225   226   227   228   229   230   231   232