Page 233 - Facilities Master Plan 2016
P. 233

Notes from Maintenance & Operations:


                                                                                                        •  Replace all portable ramps/stairs
                                                                                                        •  Interior and exterior painting and flooring  All images taken by LPA.
                                                                                                        •  Common areas (restrooms, libraries,
                                                                                                            etc.) need specialized access control
                                                                                                        •  More custodian storage
                                                                                                        •  Dumpster enclosures for 4 dumpsters
                                                                                                        •  Replace administration building sewer
                                                                                                            line
                                                                                                        •  Replace 20% of door hardware
                                                                                                        •  Replace 20% of windows
                                                                                                        •  Replace 50% of perimeter chainlink
                                                                                                            fence
                                                                                                        •  Remove 12 trees, level field








        721 Calaveras Street, Lodi, CA 95240

        EXISTING SITE INFORMATION                        CONDITION ASSESSMENT

        Year Built: 1960                                 Recently Completed Work:
        Site Acreage: 7 acres
                                                         •  Plumbing repairs in the office
        Student Population (2014-2015): 650              •  Mold remediation required a lot of work in
        Grade Levels: K-6                                   2011 including the relocation of the front entry
                                                            and parking
        Total Number of Classrooms: 29
        Number of Portables: 2
                                                         Notes/Comments from School Site:

                                                         •  Extend fencing to enclose preschool portable
                                                            and kindergarten in Room 6




        5.32       EXISTING CONDITIONS ASSESSMENT                                                                              Facilities Master Plan  231
                   LAWRENCE ES                                                                                             Lodi Unified School District
   228   229   230   231   232   233   234   235   236   237   238