Page 254 - Facilities Master Plan 2016
P. 254
be used as additional parent drop-off
• Pave the dirt areas near the portables
• Benches under the quad trees are
desired All images taken by LPA.
• A new shade structure at northwest
corner of the hardcourts is needed
• Need an additional play apparatus for
the older students
• Handball walls are desired
• The northeast corner of the field needs
to be redone
• A baseball backstop is desired
• A gate is desired at the southeast
corner of the campus for Bear Creek HS
students
Notes from Maintenance & Operations:
• Replace all portable ramps/stairs
• Interior and exterior painting and flooring
3777 A.G. Spanos Boulevard, Stockton, CA 95209 • Common areas (restrooms, libraries,
etc.) need specialized access control
EXISTING SITE INFORMATION CONDITION ASSESSMENT • More custodian storage
• Dumpster enclosures for 4 dumpsters
Year Built: 1996 Recently Completed Work: • Portables may need siding repaired
Site Acreage: 10 acres • Re-key door
• Currently going through each classroom to • Recaulk windows
Student Population (2014-2015): 520 redo drywall, carpet, and tile due to mold • Replace 60% of perimeter chainlink
Grade Levels: K-6 issues fence
• Re-roof throughout
Total Number of Classrooms: 30 • Needs new asphalt near portables
Number of Portables: 7 Notes/Comments from School Site: • Remove 12 trees
• Carpet replacement is needed on a regular
basis
• Would like the bus drop-off moved to the area
near the portables; the old bus drop-off would
5.35 EXISTING CONDITIONS ASSESSMENT Facilities Master Plan 249
JULIA MORGAN ES Lodi Unified School District