Page 254 - Facilities Master Plan 2016
P. 254

be used as additional parent drop-off
                                                                                                        •  Pave the dirt areas near the portables
                                                                                                        •  Benches under the quad trees are
                                                                                                            desired                                  All images taken by LPA.
                                                                                                        •  A new shade structure at northwest
                                                                                                            corner of the hardcourts is needed
                                                                                                        •  Need an additional play apparatus for
                                                                                                            the older students
                                                                                                        •  Handball walls are desired
                                                                                                        •  The northeast corner of the field needs
                                                                                                            to be redone
                                                                                                        •  A baseball backstop is desired
                                                                                                        •  A gate is desired at the southeast
                                                                                                            corner of the campus for Bear Creek HS
                                                                                                            students


                                                                                                        Notes from Maintenance & Operations:

                                                                                                        •  Replace all portable ramps/stairs
                                                                                                        •  Interior and exterior painting and flooring
        3777 A.G. Spanos Boulevard, Stockton, CA 95209                                                  •  Common areas (restrooms, libraries,
                                                                                                            etc.) need specialized access control
        EXISTING SITE INFORMATION                        CONDITION ASSESSMENT                           •  More custodian storage
                                                                                                        •  Dumpster enclosures for 4 dumpsters
        Year Built: 1996                                 Recently Completed Work:                       •  Portables may need siding repaired
        Site Acreage: 10 acres                                                                          •  Re-key door
                                                         •  Currently going through each classroom to   •  Recaulk windows
        Student Population (2014-2015): 520                 redo drywall, carpet, and tile due to mold   •  Replace 60% of perimeter chainlink
        Grade Levels: K-6                                   issues                                          fence
                                                                                                        •  Re-roof throughout
        Total Number of Classrooms: 30                                                                  •  Needs new asphalt near portables
        Number of Portables: 7                           Notes/Comments from School Site:               •  Remove 12 trees

                                                         •  Carpet replacement is needed on a regular
                                                            basis
                                                         •  Would like the bus drop-off moved to the area
                                                            near the portables; the old bus drop-off would


        5.35       EXISTING CONDITIONS ASSESSMENT                                                                              Facilities Master Plan  249
                   JULIA MORGAN ES                                                                                         Lodi Unified School District
   249   250   251   252   253   254   255   256   257   258   259