Page 32 - Facilities Master Plan 2016
P. 32

DISTRICT WIDE SCOPE

                                                                                          Based  on the District goals, the  Facilities Master Plan
                                                                                          Committee,  along with  LPA, generated  (17)  project  scope
                                                                                          categories that  would be the  foundation for the  work
                                                                                          proposed at each school site.  This set of guidelines serves
                                                                                          as a foundation for each conceptual master plan design
                                                                                          and ensures parity between school sites in the District while
                                                                                          allowing ease of prioritization as funds become available.



         SCOPE 1                                          SCOPE 2                                         SCOPE 3

        Modernize & Reconfigure Existing                Existing Building Systems & Toilets             Site Utilities
        Classrooms
                                                        HVAC upgrades, lighting upgrades, electrical    Update gas service lines, update sewer service
        Scope of work typically includes replacement/   upgrades, plumbing upgrades and  toilet         lines, update water service lines, update
        repair of roofs, walls, windows, doors,         modernization or reconfiguration.               electrical  mains and distribution, energy-
        floors, ceilings; interior/exterior  painting and                                               efficient building systems & controls (EMS).
        replacement/  repair of specialized program
        labs casework.




























         2.5       PLANNING & CONSIDERATIONS                                                                                   Facilities Master Plan  32
                   SCOPE OF WORK CATEGORIES                                                                                Lodi Unified School District