Page 365 - Facilities Master Plan 2016
P. 365
Notes/Comments from School Site:
• Girls’ restrooms need new flooring and
partitions All images taken by LPA.
• Boys’ restrooms need new flooring
• New stainless steel drinking fountains
are needed in lieu of ceramic
• A garden near Rooms 19 & 20 is desired
• Would like a shade structure and
bleachers at the Outdoor Classroom
• Would like hose bibs and electrical at the
Urban Garden
• Remove picnic tables near outdoor stage
and replace with a concrete walkway
• Reconfigure the administration
Notes from Maintenance & Operations:
• Add exterior lighting
• Replace gas lines
2255 Wagner Heights Road, Stockton, CA 95209 • Portables may need siding repaired
• Replace 25% of door hardware
EXISTING SITE INFORMATION CONDITION ASSESSMENT • Needs asphalt overlay at parking and
playgrounds
Year Built: 1987 Recently Completed Work: • Need new mop sinks and more storage
Site Acreage: 13.43 acres • Remove 8 trees, provide 4 new trees
• Roof • New irrigation booster pump needed
Student Population (2014-2015): 660 • New Paint
Grade Levels: 7-8 • Fixed irrigation
• New fencing
Total Number of Classrooms: 36 • New security cameras
Number of Portables: 6 • New kitchen equipment
• Flooring was replaced in food service
• Ramps to the portables were replaced
5.52 EXISTING CONDITIONS ASSESSMENT Facilities Master Plan 351
DELTA SIERRA MS Lodi Unified School District