Page 371 - Facilities Master Plan 2016
P. 371
• Would like to remodel the existing
garden area for staff use
• Band and choir need appropriate
classroom and practice spaces All images taken by LPA.
• A larger MPR is needed for the current
enrollment
Notes from Maintenance & Operations:
• Upgrade EMS
• Replace water main valves
• Portables may need siding repaired
• Replace 30% of door hardware
• Re-roof portables
• Level field
945 S. Ham Lane, Lodi, CA 95242
EXISTING SITE INFORMATION CONDITION ASSESSMENT
Year Built: 1965 Recently Completed Work:
Site Acreage: 19.86 acres
• N/A
Student Population (2014-2015): 915
Grade Levels: 7-8
Notes/Comments from School Site:
Total Number of Classrooms: 43
Number of Portables: 13 • Interested in adding STEM labs and spaces
• Need additional staff parking
• Playfields need to be redone to address
uneven surfaces
• A conference room is needed
• The library needs to be expanded
5.53 EXISTING CONDITIONS ASSESSMENT Facilities Master Plan 357
LODI MS Lodi Unified School District