Page 389 - Facilities Master Plan 2016
P. 389

•  The library needs to be updated
                                                                                                        •  Storage is needed at the library
                                                                                                        •  The music classroom needs to be
                                                                                                           updated                                   All images taken by LPA.



                                                                                                        Notes from Maintenance & Operations:
                                                                                                        •  Upgrade EMS at two buildings
                                                                                                        •  Replace gas lines
                                                                                                        •  Portables may need siding repaired
                                                                                                        •  Fascia needs to be repaired throughout
                                                                                                        •  Replace all door hardware
                                                                                                        •  Replace 70% of windows
                                                                                                        •  Re-roof MPR and portables
                                                                                                        •  Needs asphalt overlay at fire lane and
                                                                                                           playgrounds
                                                                                                        •  Need new mop sinks
                                                                                                        •  Remove 20 trees, provide 6 new trees
                                                                                                        •  Level field
                                                                                                        •  Runs off a well
        5001 E. Eastview Drive, Stockton, CA 95212                                                      •  New irrigation booster pump needed
                                                                                                           and automation
        EXISTING SITE INFORMATION                        CONDITION ASSESSMENT

        Year Built: 1965                                 Recently Completed Work:
        Site Acreage: 14.72
                                                         •  Relocation of the office
        Student Population (2014-2015): 740              •  New fencing at the front of school
        Grade Levels: 7-8                                •  New paint
                                                         •  HVAC in some areas
        Total Number of Classrooms: 36
        Number of Portables: 6
                                                         Notes/Comments from School Site:

                                                         •  Improved fields with a track are needed
                                                         •  A lunch shelter is needed
                                                         •  Remove wall between Rooms 20 & 29


        5.56       EXISTING CONDITIONS ASSESSMENT                                           40’  80’   160’  1” = 160’         Facilities Master Plan  375