Page 411 - Facilities Master Plan 2016
P. 411

Notes from Maintenance & Operations:


                                                                                                        •  Replace all HVAC units
                                                                                                        •  Replace EMS                               All images taken by LPA.
                                                                                                        •  Replace gas lines and upgrade gas
                                                                                                           regulators
                                                                                                        •  Replace sewer lines
                                                                                                        •  Portables may need siding repaired
                                                                                                        •  Replace 30% of door hardware
                                                                                                        •  Replace 40% of windows
                                                                                                        •  Re-roof portables
                                                                                                        •  Needs asphalt overlay at parking and
                                                                                                           playgrounds
                                                                                                        •  Need new mop sinks
                                                                                                        •  Replace concrete deck at pool, resurface
                                                                                                           pool and replace filter pump with VFD
                                                                                                        •  Remove 12 trees, provide 6 new
                                                                                                        •  Provide softball field for Title 9
                                                                                                        •  Provide shop building for mowers, etc.
                                                                                                        •  Needs some irrigation piping
                                                                                                           replacement and automation
        3 S. Pacific Avenue, Lodi, CA 95242

        EXISTING SITE INFORMATION                        CONDITION ASSESSMENT

        Year Built: 1956                                 Recently Completed Work:
        Site Acreage: 40.52 acres
                                                         •  N/A
        Student Population (2014-2015): 2,100
        Grade Levels: 9-12
                                                         Notes/Comments from School Site:
        Total Number of Classrooms: 91
        Number of Portables: 27                          •  A new campus is desired; current campus is
                                                            too old
                                                         •  Existing restrooms need to be renovated
                                                         •  A new theater is needed





        5.58       EXISTING CONDITIONS ASSESSMENT                                                                              Facilities Master Plan  391
                   LODI HS                                                                                                 Lodi Unified School District
   406   407   408   409   410   411   412   413   414   415   416