Page 147 - Technology Roadmap Transportation
P. 147

TECHNOLOGY ROADMAP: TRANSPORTATION





                                                                              Availability of Resources
                   SL No   Associated Technology
                                                                              Indigenously
                           Inter-vehicular couplers (mechanical, pneumatic, power
                   11                                                         Will need outside support
                           and signalling)
                                                                              Can be developed, or availed through
                   12      Door closing mechanisms
                                                                              present players in the field.
                   13      Platform surveillance system                       Can be developed indigenously
                           Design, development, testing and manufacturing of high
                           power, low loss, low weight, under-slung transformer,   Basic design may need outside
                   14      preferably with aluminium tank, of above 6-6.5 MW power  consultancy. It can also be purchased
                           suitable for high frequency switching 4Q converter with   from existing international suppliers.
                           harmonic control, hotel load and auxiliary windings.
                                                                              In the recent past, this item has been
                           Propulsion converter with IGBT (or any other type of   developed indigenously and is in
                           device which is likely to be released in future) giving   commercial operation. Industries will
                   15
                           highest standards of power quality and near unity power   be able to upgrade it to 6-6.5MW levels.
                           factor at the pantograph                           It can also be purchased from existing
                                                                              international suppliers.
                           Traction motors with fully suspended arrangement,   Basic design would need outside
                           both synchronous and asynchronous type of capacity
                   16                                                         consultancy. It can also be purchased
                           of about 1.5 MW torque transmission arrangement for
                           withstanding above 400 km/h                        from existing international suppliers.
                                                                              Basic design will need outside
                   17      High speed pantographs                             consultancy. It can also be purchased
                                                                              from existing international suppliers.

                                                                              Basic design would need outside
                   18      High speed bogie and suspension arrangement        consultancy. It can also be purchased
                                                                              from existing international suppliers.

                           Capability to model panto-Catenary interaction at high
                           speeds, especially with multiple locomotives attached
                   19      in a train as a ‘train set’ and evolve the most optimum   Will need outside consultancy
                           configuration to prevent oscillations and current
                           collection problems at high speed.

                           Data communication network between the locomotives in
                   20      a train, between locomotives and carriages as well as to   Can be indigenously developed
                           way side stations.
                           Train wide internet connectivity (wireless broadband) and
                   21                                                         Can be indigenously developed
                           Infotainment
                   22      Development of high speed OverHead Equipment (OHE)  Will need outside support
                                                                              Can be indigenously developed but
                           ERTMS (European Traffic Management System)         would take more time. Initially can
                   23
                           Implementation                                     be availed from international players
                                                                              operating in India.
                           Development of high power fuel efficient diesel engines
                   24      and diesel locomotives for tracks which are non-   Will need outside support
                           electrified
                   25      Development of high speed tracks                   Will need outside support

                           Development of state of the art facilities and skill for
                   26      maintenance of track, rolling stock and other fixed   Will need outside support.
                           installations for high speed.




                                                                                                        RAILWAYS   145
   142   143   144   145   146   147   148   149   150   151   152