Page 10 - Chameleon® Arch Series
P. 10
CHAMELEON® ARCH SERIES
Introduction
Overview
Congratulations on your purchase of the Belanger, Inc. Chameleon® ARCH. The purpose of this
manual is to familiarize you with the way that the Chameleon® ARCH is installed, the various
ways in which it can operate, and how to maintain it after installation.
The Installation section will be used in conjunction with specification sheets, location diagrams,
Arch Configuration sheets, and the Chameleon® ARCH drawings. All of these combined are
your guide to installation.
The Maintenance sections will be used to make sure you can keep your car wash component
looking and running like new.
Whether you have already operated a car wash or you are new to our industry, you know the
importance of the appearance of a car wash and its equipment to the customer. Keeping the
equipment clean will not only make the equipment easier to maintain, it will act as an example to
your customer to keep their equipment (their automobile) clean as well. Replacing the cleaning
material as necessary, will also help the image of your wash and keep the customer coming
back.
Read through the entire manual to familiarize yourself with the CHAMELEON® ARCH before
installation. When installation is completed, you will want to keep this manual as a guide to
proper maintenance.
The new Chameleon® Stiks and the Chameleon® Arch are available in 8 different frame work
colors (aluminum, white, green, black, red, yellow, orange, and blue), eight different filler strip
colors (gray, white, green, black, red, yellow, orange, and blue), and five different neon strip
colors (red, yellow, orange, blue, green), all of which can be mixed and matched with each
other. The main Spray Arch Manifolds are constructed with 1/2” schedule 10 stainless steel
pipes and is supplied with stainless steel fittings. The Chameleon® Arch Series consists of 12
nozzle holes which are flo-drilled for 1/8” NPT and use the current Belanger nozzle kits.
With RO water, and approved acid and alkaline based chemicals. A 3/4”NPT fitting and hose
barb are included for the normal supply feeds. The feeds are in the center of the arch for
optimum and balanced flow.
6 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681 1MANUL526