Page 18 - Airblade® Dryer - Mix and Match
P. 18

AIRBLADE® DRYER Mix and Match



             Introduction


             Before You Get Started

                    Tools needed for installation:
                        Hammer drill with a 1/2” and a 5/8” bit       Work gloves
                        Tape measure (12 foot or greater)             Tin snips
                        25 foot extension cord                        Safety glasses

                        Miscellaneous hand tools                      Level
                        Leveler                                       Fork-lift

                    Note:  Uncrate and inspect shipment for damage, and to verify that all pieces are there. If there
                            is any damaged equipment, file a claim with the trucking company immediately. Receiving
                            party is responsible for filing claim with trucking company. Notify your local distributor
                            or Belanger, Inc. immediately. If shipment is determined damaged or incomplete.


                                                   CAUTION

                        It is recommended that a licensed electrician is contracted to perform all
                                                  electrical installations.




                        Disconnect and lockout electrical power before servicing any equipment!




                      Always wear safety glasses when performing maintenance on any equipment.





















              14                              Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681                                          1MANUL011
   13   14   15   16   17   18   19   20   21   22   23