Page 12 - Foam Bullet™
P. 12
Foam Bullet™
Introduction
Before You Get Started
Tools Needed for Installation:
Work gloves #7 Drill Bit
Safety glasses Tin snips
Tape measure (25 foot or greater) Miscellaneous hand tools
1/4"-20 Tap Drill
Thread Cutting Oil 9/32” Drill Bit
Things You Need To Know Before You Get Started:
Parts needed for installing two (2) Foam Bullets™ supplied by a Belanger® MixStir® Delivery
System:
1/4” male npt x 3/8” push in tube 90° elbow: 1 (reference 1ELBOW-PL535)
1/2” push in stem x 3/8” push in tube straight reducer: 1 (reference 1REDUC-PL127)
3/8” push in tube union tee: 2 (reference 1TEE-PL830)
3/8” black airline: quantity will vary (reference 1AIRLN633; 100’ BAG)
3/8” natural airline: quantity will vary (reference 1AIRLN635; 100’ BAG)
Parts needed for installing three (3) Foam Bullets™ supplied by a Belanger® MixStir®
Delivery System:
1/4” male npt x 1/2” push in tube 90° elbow: 1 (reference 1ELBOW-PL764)
1/2” push in tube x 3/8” push in tube three-way divider: 2 (reference 1FTTNG-PL375)
3/8” black airline: quantity will vary (reference 1AIRLN633; 100’ BAG)
3/8” natural airline: quantity will vary (reference 1AIRLN635; 100’ BAG)
1/2” black airline: quantity will vary (reference 1AIRLN839; 100’ BAG)
1/2” natural airline: quantity will vary (reference 1AIRLN908; 100’ BAG)
1MANUL022 Belanger, Inc.® * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 8