            Chapter 1 Introduction



            Greetings

               This Introduction Section is intended to:

                      ·  Address the installation portion only.
                      ·  Help you to understand how the installation manual is organized.
                      ·  Encourage planning and organization.

                      ·  Address safety issues.
               Installation Manual

                Just as it says, this is the manual that covers the installation portion of a Saber® In-bay system. In this manual there is
                very little content as to operation, maintenance, troubleshooting and so on.  For these items please reference their
                respective manuals.

               How the Manual is Organized

                The installation manual starts off with a "punch list" of activities that must be performed during the installation phase.
                The  list  is  fairly  comprehensive,  and  provides  somewhat  of  an  order  in  which  the  tasks  should  be  completed  to
                minimize installation time.

                This list also acts as a directory for the remainder of the manual. Now is a good time to review the Recommended
                Installation Sequence checklist in chapter 2.
                The last section of the installation manual is concerned with initial startup. Again, a checklist format is provided as a
                walk through of starting up and fine tuning the Saber® system.

               Planning and Organization
                This is the most important ingredient for a timely installation. At this point, most of the planning has probably been
                done. For example, your Belanger Representative may have already visited the site. Measurements were taken, and
                quite possibly drawings produced showing equipment locations.
                The installation manual assumes that these items have been thoroughly reviewed by the site General Contractor and
                Owner. If they have not been now is the time to do so. For your convenience, the "Getting Started" section reiterates
                some of the critical points of a Saber® installation. Primarily equipment placement and electrical considerations to
                ensure the Saber® system is installed successfully. If there is a planning question not covered in this manual, please
                reference the Pre-Install Manual.

               Ensure a Safe Work Environment
                The job site can be a hectic place. Often deadlines control the pace. Please keep in mind Job Site Safety at all times.
                Proper use of all safety gear (safety glasses, hard-hats, footwear, shields, guards, etc.) is imperative. Be aware of
                electrical concerns (exposed conductors, extension cords, proximity to water, power tool maintenance, etc.). Be sure
                to  obey  OSHA  Lockout/Tagout  procedures  and  that  everyone  on  site  understands  this  process.  Rigging  (fork  lift
                operation)  is  another  concern.  Minimize  slip,  trip,  and  fall  potentials  consistently.  In  short,  be  aware  of  OSHA
                considerations, in addition to rules and regulations put in place by your local authorities.
                It is imperative to your safety and the safety of others to always follow safe work
                procedures.








             1-6    Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681      1MANUL290
   11   12   13   14   15   16   17   18   19   20   21