Page 13 - The Chameleon® Stik
P. 13
THE CHAMELEON® STIK
Installation
Assembly and Lagging to the Floor
During the installation handle the neon tubes with care taking special precaution to
not bend the tubing in the opposite direction how it was rolled up.
1) Before placing the Chameleon® Stik into the bay remove the back black plastic cover
from the rear and plug in the 120VAC plug connected to the neon tubing to test the
function of the neon, cycle through the various functions to test that they all work properly
and no damage occurred during shipping.
2) Position the Chameleon® Stik assembly at the desired tunnel location. Level and lag into
place.
3) Run 120VAC out to the Chameleon® Stik. Cut the 120 VAC plug off the neon tube, leave
enough extra to run the cord into the junction block, then wire the neon tube inside the
box.
4) Replace the back black plastic cover.
1MANUL520 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 9