Page 13 - The Chameleon® Stik
P. 13

THE CHAMELEON® STIK


                       Installation


                       Assembly and Lagging to the Floor




                         During the installation handle the neon tubes with care taking special precaution to
                                  not bend the tubing in the opposite direction how it was rolled up.
                              1)  Before placing the Chameleon® Stik into the bay remove the back black plastic cover
                                 from the rear and plug in the 120VAC plug  connected  to  the  neon tubing to test the
                                 function of the neon, cycle through the various functions to test that they all work properly
                                 and no damage occurred during shipping.















                              2)  Position the Chameleon® Stik assembly at the desired tunnel location. Level and lag into
                                 place.
                              3)  Run 120VAC out to the Chameleon® Stik. Cut the 120 VAC plug off the neon tube, leave
                                 enough extra to run the cord into the junction block, then wire the neon tube inside the
                                 box.
                              4)  Replace the back black plastic cover.





































                        1MANUL520              Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681       9
   8   9   10   11   12   13   14   15   16   17   18