Page 31 - Full Side Washer
P. 31

FULL SIDE WASHER


                       Installation


                       Neo-Tex Cleaning Material

                          Upper Hub
                                          1)  Mount the two 6” diameter x 42-1/2” tall hubs so that they set on top of the lower
                                              hubs by securing the “Spider” Clamps to the shafts and securing the “Skins” to the
                                              Spiders as shown. Be sure that the  open  ends  of the “C” channels are facing
                                              upward (FIGURE 1).
                                          2)  Locate the 41” x 8” Neo-Tex pieces that are 1/4” thick (thicker Neo-Tex material).
                                              Fold them in half and place one in the first, middle and last slot of each skin of the
                                              hub, making sure they are pushed all the way to the bottom (FIGURE 2).
                                          3)  Locate the 25” x 8” Neo-Tex pieces that are 1/8” thick (thinner Neo-Tex material).
                                              Load two pieces onto each 8” clip to provide the fill for this row. Place 12 of these
                                              assemblies into the previous slots filled to continue stacking the upper hub.
                                          4)  Locate the 25” x 8” Neo-Tex pieces that are 1/4” thick (thicker Neo-Tex material).
                                              Load one piece onto each 8” clip to provide the fill for this row. Place 12 of these
                                              assemblies into the previous slots filled to continue stacking the upper hub.
                                          5)  Locate the 28” x 8” Neo-Tex pieces that are 1/4" thick (thicker Neo-Tex material).
                                              Load one piece onto each 8” clip to provide the fill for this row. Place 12 of these
                                              assemblies into the previous slots filled to continue stacking the upper hub.
                                          6)  Locate the 32” x 10” Neo-Tex pieces that are 1/4" thick (thicker Neo-Tex material)
                                              Load one piece onto each 10” clip to provide the fill for this row. Place 12 of these
                                              assemblies into the previous slots filled to continue stacking the upper hub.

                                                                                First, middle
                                                                                and last slot
                                                       FIGURE 2                 of a skin



                                                 Upper Hub
                                                   (Top view)







                              FIGURE 1                  Top Row 32” x 10”
                                                        Insert into one 10” clip.
                                                                                            FIGURE 3
















                       1MANUL854         Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681        27
   26   27   28   29   30   31   32   33   34   35   36