Page 23 - Wave Across™
P. 23
WAVE ACROSS
Maintenance
Routine Procedures
Daily
• Start every washday with a “Test Wash” to insure proper operation of all equipment.
• Inspect the component for clogged nozzles. This can best be done while running the “Test Wash” in the
morning. Nozzles can be cleaned by removing the nozzle bodies and tapping or inserting a thin wire into the
nozzle opening.
• Dump any water that has settled in the air compressor or install a timed pump valve (not supplied).
• Check operation to insure uniform foam is being applied where applicable. This is best be checked while
running the “Test Wash” in the morning.
• Check the chemical injection pump(s) to insure that the pump is properly primed if applicable. This is done by
checking the chemical inside of the clear supply tubing. There should be no bubbles or breaks in the fluid (if
applicable).
• Check overall performance for any abnormalities on the first few vehicles washed each day.
• Hose down the component and surrounding area at the end of each washday. This will remove the majority of
the dirt and other debris that builds up during a washday.
• Check for water and chemical leaks after equipment is turned off.
Weekly
• Check all mixing tanks periodically for sludge build-up on bottom. If too much sediment is evident, drain tank
and clean (if applicable).
Monthly
• Wash component down with a good degrimer such as Tide laundry detergent and hot water.
Quarterly
• Scrub down aluminum portions of the component with a fine steel wool such as S.O.S. pads and wash with
good degrimer such as Tide laundry detergent and hot water (whenever using steel wool on aluminum, always
follow the grain to prevent scratching the finish).
Semi-Annually
• There is a grease fitting located on the gearbox opposite of where the electric motor mounts. This fitting is there
so the shaft bearing can be greased, because there is not enough splash from the ring gear to lubricate the
bearing.
• It is recommended that one squirt of a general-purpose grease be applied every six months.
1MANUL850 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 19