Doc.No.       ENG-BIMG-00
                                      ACSET BIM GUIDELINE                  Effective date    Juli 2018
                                               (LEVEL 2)
                                                                          Page    7 of 47   Rev.   00



                                  PENGGUNAAN BIM YANG DISARANKAN

                   No         Tahap            Penggunaan BIM yang disarankan               Distribusi

                      1.    TENDER              a.  Create / Developing BIM Model(s) for
                                                   Complex Construction Area
                                                b.  Create / Developing Site Planning (Logistic
                                                   Planning)
                                                c.  Visualization
                                                d.  Volume Breakdown*

                      2.    PRE-                a.  Create Models based on Consultant        Head Office
                          CONSTRUCTION             Drawings
                                                b.  Reviewing Models
                                                c.  Integrated model with Project Planning &
                                                   Schedulling
                                                d.  Sequencing for Detail Complex
                                                   Construction

                      3.    CONSTRUCTION        a.  Construction Coordination
                                                b.  Modelling & Shopdrawing
                                                c.  Prefabrication

                                                                                              Project
                      4.    POST-               a.  As-Built Model* or Drawing
                          CONSTRUCTION          b.  Model for Facility Management *


                 Notes:
                    * Dapat diaplikasikan jika kontraktor mendapat File BIM dari konsultan.

















                                                                                                                Edisi  Juli 2018