Page 391 - 2018 National Home Improvement
P. 391

2018 National Home Improvement Estimator, All Rights Reserved                                   Page 313



            Wood cabinets are stained to bring out the warmth of the wood grain and then sealed for moisture
            protection. Install unfinished cabinets if your client wants to match existing woodwork in the home. But
            be prepared to do a lot of sanding and hand rubbing to produce a finish equal to the best of stock
            cabinets. Many cabinet vendors offer special custom glazes and layered finishes at extra cost – usually
            about 10 percent more than standard stained cabinets.

            Kitchen Remodeling Checklist
              Cabinets – Soffits, countertops, size of back splash, accommodating a dishwasher?
              Ceiling – Repaired, acoustic tile, suspended ceiling, drywall
              Electrical – See the Kitchen Electrical Service Checklist for new outlets needed
              Floor – Underlayment, vinyl tile, sheet vinyl, ceramic or clay tile
              Heating and cooling – Ducts or radiators relocated
              Doors – Change in location or swing. New trim
              Plumbing – New venting, gas line relocated, change sink location, dishwasher
              Structural changes – Partitions removed or moved
              Wall repairs – Ceramic tile, paint, wallpaper, paneling
              Windows – Relocated, increase or decrease in size. Storm windows
              Ventilation – Kitchen exhaust hood, ducted or ductless

            Kitchen Appliances
            Most home improvement contractors avoid reselling kitchen appliances that only need to be plugged in.
            Every homeowner knows where to get a good deal on a refrigerator. Instead of quoting prices, include a
            cash allowance for appliances in the contract price. For example, your contract might include the
            following language:

            This agreement includes an allowance of $_________ for the following appliances:
             ____________________________ _______________________________________
            Owner agrees to bear the cost of appliances that exceed this allowance. Contractor agrees to furnish
            and install all gas, water, drain, vent and electrical lines required for operation of these appliances.
            Contractor is not responsible for installation, service or maintenance of these appliances.

            Built-in appliances, such as garbage disposers, cooktops and wall ovens are an exception to the rule on
            appliances. These are fixtures, a part of the home itself, and should be included in your bid as a
            courtesy to the owner. Be sure to specify in the contract the brand and model the customer chose so
            that’s what you price.


            You’ll never see an old kitchen with adequate electrical service. Upgrading the electrical service is a
            prime reason for remodeling most kitchens. Consider the following checklist when planning extra runs
            from the electrical service panel. Note that some building codes require as many as three ground-fault
            receptacles in the kitchen. If you’re adding base cabinets, figure which electrical outlets have to be
            moved.
   386   387   388   389   390   391   392   393   394   395   396