            Kitchen Demolition

            Remove cabinets. Per linear foot of cabinet face or back (whichever is longer). The cost of removing
            base cabinets includes the cost of removing the countertop. Add the cost of moving plumbing, electrical
            and HVAC lines. These figures assume debris is piled on site. No salvage of materials or fixture moving
            is included.
              Wall cabinets, wood                           BL@.250   LF         --      8.16       8.16
              Wall cabinets, metal                          BL@.350   LF         --    11.42      11.42
              Base cabinets, wood                           BL@.400   LF         --    13.05      13.05
              Base cabinets, metal                          BL@.550   LF         --    17.94      17.94
              Remove cabinet door only                     BC@.250    Ea         --    10.07      10.07
              Remove and replace cabinet door              BC@.580    Ea         --    23.35      23.35

            Remove kitchen fixtures. These figures include turning off the water, disconnecting the drain, capping
            the lines, disconnecting faucets and fittings, removing the sink from the base cabinet and piling debris
            on site. No salvage value assumed. Reduce these costs by 25% if countertop and base cabinets are
            also being demolished. If a new floor surface has been laid over the original floor, there may be no way
            to remove undercounter appliances without damaging either the floor or the countertop.
              Self-rimming sink                             BL@1.00   Ea         --    32.62      32.62
              Ledge-type or huddee ring sink                BL@1.65   Ea         --    53.82      53.82
              Self-rimming sink with disposer               BL@1.50   Ea         --    48.93      48.93
              Ledge-type or huddee ring sink with disposer  BL@2.00   Ea         --    65.24      65.24
              Garbage disposer                              BL@.500   Ea         --    16.31      16.31
              Undercounter dishwasher                       BL@1.00   Ea         --    32.62      32.62
              Undercounter trash compactor                  BL@.800   Ea         --    26.10      26.10

            Remove ceiling cover. Per square foot of ceiling. Add the cost of removing electrical fixtures. Debris
            piled on site. No salvage of materials included except as noted.
            Plaster ceiling
              Including lath and furring                    BL@.025   SF         --      0.82       0.82
              Including suspended grid                      BL@.020   SF         --      0.65       0.65
            Acoustic tile ceiling
              Including suspended grid                      BL@.010   SF         --      0.33       0.33
              Including grid in salvage condition           BL@.019   SF         --      0.62       0.62
              Tile glued or stapled to ceiling              BL@.015   SF         --      0.49       0.49
              Tile on strip furring, including furring      BL@.025   SF         --      0.82       0.82
            Drywall ceiling
              Nailed or attached with screws
               to joists                                    BL@.010   SF         --      0.33       0.33
              Dropped drywall ceiling on wood or
               metal grid, including grid                   BL@.022   SF         --      0.72       0.72
              Drywall on plaster and lath, including lath
               and plaster                                  BL@.041   SF         --      1.34       1.34


            Remove floor cover. Per square yard of floor cover removed. Debris piled on site. No salvage of
            materials included.
              Ceramic tile, pneumatic breaker               BL@.263   SY         --      8.58       8.58
              Hardwood, nailed                              BL@.290   SY         --      9.46       9.46
              Hardwood, glued                               BL@.503   SY         --    16.41      16.41
              Linoleum or sheet vinyl                       BL@.056   SY         --      1.83       1.83
              Resilient tile                                BL@.300   SY         --      9.79       9.79
              Terrazzo                                      BL@.286   SY         --      9.33       9.33
              Carpet on tack strip                          BL@.028   SY         --      0.91       0.91
              Bonded floor, scraped                         BL@.135   SY         --      4.40       4.40