Page 595 - 2018 National Home Improvement
P. 595

2018 National Home Improvement Estimator, All Rights Reserved                                   Page 473



            Labor for painting interior panel door, frame and trim -- spray. New installations only. Includes
            paint application only. Add the cost of surface preparation, protecting adjacent surfaces, mobilization,
            cleanup and callbacks.
              Spray 1 coat of water-base undercoat,
               14 doors per gallon, per door               PT@.110    Ea         --      4.52       4.52
              Spray 1st finish coat of water-base enamel,
               15 doors per gallon, per door               PT@.080    Ea         --      3.29       3.29
              Spray additional finish coats
              of water-base enamel,
               16 doors per gallon, per door               PT@.080    Ea         --      3.29       3.29

            Labor for staining 2" x 4" fascia. Front side and bottom edge only. Stain application only. Add the
            cost of surface preparation, protecting adjacent surfaces, mobilization, cleanup and callbacks. For
            heights above 8', use the high time difficulty factors.
              Roll and brush each coat of solid-body stain,
              130 linear feet per gallon,
               per 100 linear feet                         PT@.488 CLF           --    20.05      20.05
              Roll and brush each coat of semi-transparent stain,
              150 linear feet per gallon,
               per 100 linear feet                         PT@.444 CLF           --    18.24      18.24
              Spray each coat of solid-body stain,
              100 linear feet per gallon,
               per 100 linear feet                         PT@.308 CLF           --    12.66      12.66
              Spray each coat of semi-transparent stain,
              115 linear feet per gallon,
               per 100 linear feet                         PT@.286 CLF           --    11.75      11.75

            Labor for staining 2" x 6" or 2" x 10" fascia. Front side and bottom edge only. Stain application only.
            Add the cost of surface preparation, protecting adjacent surfaces, mobilization, cleanup and callbacks.
            For heights above 8', use the high time difficulty factors.
              Roll and brush each coat of solid-body stain,
              110 linear feet per gallon,
               per 100 linear feet                         PT@.571 CLF           --    23.46      23.46
              Roll and brush each coat of semi-transparent stain,
              130 linear feet per gallon,
               per 100 linear feet                         PT@.513 CLF           --    21.08      21.08
              Spray each coat of solid-body stain,
              80 linear feet per gallon,
               per 100 linear feet                         PT@.333 CLF           --    13.68      13.68
              Spray each coat of semi-transparent stain,
              95 linear feet per gallon,
               per 100 linear feet                         PT@.319 CLF           --    13.11      13.11

            Labor for staining 2" x 12" fascia. Front side and bottom edge only. Stain application only. Add the
            cost of surface preparation, protecting adjacent surfaces, mobilization, cleanup and callbacks. For
            heights above 8', use the high time difficulty factors.
              Roll and brush each coat of solid-body stain,
              75 linear feet per gallon,
               per 100 linear feet                         PT@.769 CLF           --    31.60      31.60
              Roll and brush each coat of semi-transparent stain,
              95 linear feet per gallon,
               per 100 linear feet                         PT@.667 CLF           --    27.41      27.41
   590   591   592   593   594   595   596   597   598   599   600