he power distribution segment is one of the most important   Where we stand   Upadhyaya Gram Jyoti Yojana), IPDS (Integrated Power Develop-  •   In order to improve the performance of the distribution sec-
 link in the power sector with DISCOMs (distribution compa-  ment Scheme) and SAUBhAGYA (Pradhan Mantri Sahaj Bijli har Ghar    tor, a number of attempts have been made by Government of
 Tnies) being the backbone of the electricity supply market,   Power distribution utilities today in most of the states are state gov-  Yojana) have shown marked progress.   India. These include legal and regulatory reforms under the
 connecting end users with generators of electricity. Power distribu-  ernment owned entities, with a license to supply power in the area   •   The distribution sector is now buzzing with endeavors in-  electricity Regulatory Commissions Act, 1998, and the elec-
 tion utilities today in most of the states are state government owned   of their respective states. While competition has been introduced in   cluding smart metering by Uttar Pradesh, prepaid metering   tricity Act, 2003, which paved the way for competition and
 entities, with a license to supply power in the area of their respective   power generation and power transmission sectors, competition in   by Manipur, IT implementation by Tripura, introduction of   altered the industry structure and governance framework.
 states.   power distribution sector is limited to ‘open access’ through which a   energy Audit Software (eAS) by Madhya Pradesh, constitu-  •   The eA 2003 de-licensed generation and enabled rapid ca-
 While competition has been introduced in power generation and   power generator or trader can directly supply power to end-consum-  tion of anti-theft vigilance squad by Rajasthan, electricity   pacity addition through private sector participation. To re-
 power transmission sectors, competition in power distribution sec-  ers using the network of power transmission and distribution utilities.   theft prevention campaigns by haryana, etc.   vive the financially stressed sector, the central government
 tor is limited to ‘open access’ through which a power generator or   Power distribution in a few large cities like Delhi, Mumbai and Kol-  •   For modernisation of distribution segment, the Government   from time to time has initiated bailout packages such as the
 trader can directly supply power to end-consumers  using the net-  kata has been privatized while private participation is also allowed   has notified a target of making all meters – smart and prepaid   Financial Restructuring Plan (FRP) in 2012-13 and UDAY in
                                                   st
 work of power transmission and distribution utilities.  through Distribution Franchisees, offered by State Governments in   over a period of three years starting 1  April 2019. NTPC and   2015-16. Further, government schemes such as DDUGJY, Re-
 In the distribution segment, emerging areas like rooftop solar, elec-  few towns.   POWeRGRID have entered into a joint venture for entering   structured Accelerated  Power  Development  and  Reforms
 tric vehicles, smart meters, storage, ancillary services etc. are going   The government has introduced several programmes such as    into electricity distribution business.   Programme  (R-APDRP),  and  IPDS,  aimed  at  increasing  the
 to open additional avenues of investment.   UDAY (Ujwal DISCOM Assurance Yojana), DDUGJY (Deen Dayal    •   Under the UDAY scheme, more than INR 36,000 Crores (USD   number of connections and strengthening the distribution
                    5.02 bn) interest cost has been saved by DISCOMs in past        network, have been undertaken.
 Recent poweR distRibution schemes  two years. AT&C losses have come down to 18.76% in FY18   •   Govt of India is drafting a national perspective plan to ad-
                    as compared to 20.77% in FY16 . The current national level      dress all the people, process and technology related aspects
                                              1
                    ACS-ARR (average cost of supply and the revenue realised)       required for making the power sector robust and resilient.
                                                                    2
 rEst (rural
 Accelerated
 Electricity supply  03  electrification of 1 lakh   05  DDuGJY (Deen Dayal   07  gap is at 26 paisa/unit as compared to 58 paisa/unit in FY16 .   The plan would aim at sustaining the goal of 24X7 uninter-
 upadhyay Gram Jyoti
 electRiFication  technology Mission  villages & 1 Cr HHs  Yojana)  States like Gujarat,  himachal Pradesh, Karnataka, Kerala,   rupted Power for all with increasing demand of electricity by
 99.99% households   Tamil Nadu, Telangana, Dadra & Nagar haveli and Daman &        consumers. The plan would lay emphasis on 100% metering
 PMGY (Pradhan   Accelerated rural   rGGVY (rajiv   saubhagya (Pradhan   electrified  Diu have already achieved less than 15% AT&C losses.  of all consumers, power reliability and availability. Addition-
 01  Mantri Gramodaya   02  Electrification   04  Vidyutikaran Yojana)  06  Har Ghar Yojana)  •   India’s rank in World Bank’s ease of doing business - “Get-  ally, the plan also envisages conversion of all electricity con-
 Gandhi Grameen
 Mantri sahaj bijli
 Programme
 Yojana)
                    ting electricity” Ranking has improved to 24 in 2018 from 137    sumer meters into smart meters in prepaid mode within the
                    in 2014.                                                        next three years. Smart metering would empower consum-
                 •   A national perspective plan at the distribution level is being   ers with tools to help them conserve energy and plan their
                    drafted by Central electricity Authority (CeA), with needs of   electricity usage in an efficient and optimum manner.
 APDP (Accelerated   APDrP (Accelerated   restructured   iPDs (integrated   the consumers at the centre of its focus. The plan anticipates   •   To facilitate state utilities to ensure quality and reliable 24x7
 Power Development   Power Development &   APDrP  Power Development
 netwoRk   1,388/1405 towns   an increase in distribution sub-station capacity of 38% and   power supply in the urban areas, Government of India had
 stRengthening  Programme)  reform Programme)  scheme)  it enabled  in distribution transformation capacity of 32% as well as an   launched IPDS in 2014 for strengthening of sub-transmission
 85% of 11kV        increase in feeder lengths of 27-38% till 2022.                 and distribution networks in the urban areas, metering of
 01  02  03  04  feeders being                                                      distribution transformers, feeders and consumers in the ur-
 monitored online
             opportunities                                                          ban areas and IT enablement of distribution sector among
                                                                                    others.
                 •   The viability and efficiency of the distribution segment
                    would be critical to attract investments into other segments
                    of power sector value chain. The overall investments and ef-  in the distribution segment, emerging
 Discom   Financial restructuring   uDAY    ficiency of the power sector has significant impact on the
 Financial   of state Distribution   (ujwal Discom                           areas like rooftop solar, electric vehicles
 RestRuctuRing  Companies  Assurance Yojna)  ~inr 36,000 (usD   overall socio-economic development of the country. There-
 5.02 bn) reduction                                                          and smart meters are going to open
 in book losses of   fore, future strategies need to be based on an integrated ap-
 01  02  Discoms (FY2016-  proach supported by all stakeholders including government,   additional avenues of investment
 FY2018)
                    regulator, utility and consumers at large.


 32  shaping new energy dimensions  energising sustainable & prosperous Future                                                     33