Page 61 - Air Forces Monthly - September 2017
P. 61

P-3C 60+06 was a participant in Joint Warrior 17/1 at RAF Lossiemouth, Moray, earlier this year.  This biannual exercise is billed as the largest in Europe and
           involves dozens of warships and submarines as well as MPAs.  John Reid
           flight rules (IFR) equipment.  flying hours in 46 missions.  Emergencies, in Cuxhaven.  Converted to Do 228NG
            The first P-3 is expected to   The German Orions have   The Marineflieger began   standard in 2011, Do 228LM
           emerge from the programme   amassed 5,500-plus flying   operations with the Do 228LM,   57+04 kept its original sensor
           in late 2018.  All work should be   hours in some 650 missions   a special-mission version of   suite, including a Swedish Space
           completed within eight years,   in the operation.     the Do 228-212, in 1991.  A   Corporation side-looking airborne
           and will give each aircraft a                         single Do 228LM (57+01)    radar (SLAR).  Its antenna is
           15,000-hour life extension.  Dorniers                 operated alongside two Do   mounted in a pod under the
            The Marineflieger first deployed   Apart from flying P-3Cs, MFG   28OUs (‘oil units’) until the   forward fuselage.  The newly
           the Orion on an international   3’s 2. Staffel also operates two   latter retired in 1995.  delivered Do 228NG is equipped
           mission in 2008, when a P-3C   Dornier Do 228s.  They are almost   A second Do 228LM (57+04)   with a different sensor suite
           replaced one of MFG 3’s Atlantics   exclusively tasked with detecting   joined in 1998.  The oldest Do   including a Terma SLAR, which
           in Operation Enduring Freedom   oil and chemical pollution in   228LM (57+01) was put up for   has two antennas mounted on
           in the Horn of Africa.  Flying   the North Sea and Baltic, but   sale in 2012 and replaced by a Do  the forward fuselage sides.
           from Djibouti, the German   can also be called on for SAR.  228NG (‘new generation’), which   A standard Do 228 crew
           P-3Cs continued operations in   Although flown by the   has a glass cockpit and new five-  consists of two pilots and a
           Enduring Freedom until 2010.  Marineflieger, the Do 228s are   blade propellers that reduce   sensor operator, but can be
            Since 2009, Marineflieger P-3Cs   owned by the Bundesministerium  overall weight and improve   increased to five for specific
           have also taken part in the EU’s   für Verkehr und digitale   performance and endurance.  missions.  Missions are flown
           Operation Atalanta in the same   Infrastructur (BMVI, Federal   MFG 3 took delivery of the new   daily and can last up to 5 hrs,
           area.  Flying with the callsign   Ministry for Traffic and   aircraft in late 2011.  Pending   30 mins.  The aircraft and their
           ‘Jester’, an MFG 3 Orion most   Digital Infrastructure) and   acceptance of all equipment   crews are available around-
           recently operated from Djibouti   operated on behalf of the   on board, it carried test serial   the-clock at 2 hours’ notice and
           from early March to late June   Havariekommando, Germany’s   98+35 until re-serialled as   the pair fly around 2,000 hours
           this year, accumulating 386   Central Command for Maritime   57+05 in March 2014.  annually.  Kees van der Mark AFM































           www.airforcesmonthly.com                                                               #354 SEPTEMBER 2017 //  61
   56   57   58   59   60   61   62   63   64   65   66