Page 31 - UWHC Architecture Proposal
P. 31
HIGHER EDUCATION
UNIVERSITY OF WISCONSIN - MADISON
VAN HISE HALL 2ND FLOOR REMODELING
Project Information: Project Description:
Client: This project completely reworked the interior fixed instructor’s stations, new flooring, wall and
University of Wisconsin-Madison core of the 2nd floor of Van Hise Hall, creating ceiling finishes, new energy efficient lighting,
two new POD-based collaborative learning IT and Audio Visual upgrades with touch pad
Project: classrooms, relocated and reconfigured the AV programming, refurbished mechanical air terminal
Van Hise Hall and Russell Labs & Learning Lab Resource Center and opened the cabinets, reconfigured mechanical supply / return,
Collaborative Learning Classrooms corridors to a new College of Letters & Sciences and new pneumatic controls. Fire detection was
Student Study Space. reworked and a fire suppression system was
Location: added to the work area.
Madison, WI Two distinct collaborative learning classroom
layouts were created, testing different mobile
Construction Cost: furniture layouts. Classrooms were equipped with
$736,614
Area:
5,328 asf
Team:
Aro Eberle Architects
Michael Eberle
-Project Mgr.
-Lead Design
-CA
Shannon Miller
-Project Architect
-CA
Christine Pearson
-Interior Design
Alex Burki
-Interior Design
Cole Hamilton
-Architectural Intern
STUDY LOUNGE
Henneman Engineering
Miron Construction
ACTIVE LEARNING CLASSROOM
WALK-UP COMPUTER WORKSTATIONS
PAGE 31