Page 174 - Buck Tilton - Outward Bound Ropes, Knots, and Hitches 2 ed.
P. 174

Bring  the  working  end  across  the  standing  part

                    and through both turns in the line that is around
                    or  through  the  anchoring  point.  You  have  now
                    tied a half hitch through two loops.









                         Anchor (Fisherman’s) Bend: Step 4


































                    Snug up the first half hitch and tie a second half
                    hitch around the standing part. Tighten the entire

                    knot.







                Buntline Hitch


                A  VERY  SECURE  KNOT  FOR  CONDITIONS  WHERE  THE

                LINE  AND  ATTACHMENT  POINT  WILL  BE  SHAKEN
                VIGOROUSLY
   169   170   171   172   173   174   175   176   177   178   179