Page 174 - Buck Tilton - Outward Bound Ropes, Knots, and Hitches 2 ed.
P. 174
Bring the working end across the standing part
and through both turns in the line that is around
or through the anchoring point. You have now
tied a half hitch through two loops.
Anchor (Fisherman’s) Bend: Step 4
Snug up the first half hitch and tie a second half
hitch around the standing part. Tighten the entire
knot.
Buntline Hitch
A VERY SECURE KNOT FOR CONDITIONS WHERE THE
LINE AND ATTACHMENT POINT WILL BE SHAKEN
VIGOROUSLY