Page 2000 - Workshop Manual - Tunland (2017)
P. 2000

52-32                    POWER STEERING - STEERING GEAR ASSEMBLY

                                                      (b)    Tighten the retaining bolts of the steering
                                                             transmission shaft.
      52
                                                             Torque: 25 ~ 30 N·m














                                                      13 .   Connect the Pipe
                                                      (a)    Tighten the nuts connecting the steering gear
                                                             connection.
                                                             Torque: 30 ~ 40 N·m













                                                      14 .   Install the Steering Gear Ball Joint

                                                      (a)    Install the steering gear ball joint and tighten
                                                             the retaining nuts.

                                                             Torque: 84 ~ 100 N·m













                                                      (b)    Install a new split pin.
   1995   1996   1997   1998   1999   2000   2001   2002   2003   2004   2005