Page 15 - Gi_November2020
P. 15
Innovations 2020
Foambag Operation
on Stubs (FBOS)
A method of replacing short lengths of T1 stubs,
for diameters of 4” up to 6”, including one-way fed,
in sensitive locations or where access onto the
main is restricted.
INNOVATIVE ENGINEERING FOR TRENCHLESS RENOVATION AN DECOMMISSIONING OF PIPES WORLDWIDE
125MM MINI PIPE HANDLER
Illustrated Parts & Price List Valid Until July 2021
Perpetual Pusher
A stationary digger attachment used to manoeuvre
and continually insert PE from 63mm up to 180mm
(no shells required)
SMARTester
The wireless pressure testing system that provides
a bank of definitive test evidence, giving the
engineer and business reassurance of compliance
and traceability.
SMARTester Compatible with
Visit us at Utility Week Live Online
utilityweeklive.co.uk – 24-26th November
Steve_Vick_International_Gas_International_FullPage_Advert_A4_151020_V5.indd 1
15/10/2020 09:28
Steve_Vick_International_Gas_International_FullPage_Advert_A4_151020_V5.indd 1 15/10/2020 09:28
15/10/2020 10:08
Untitled-15 1
Untitled-15 1 15/10/2020 10:08