Page 69 - SMM2 eBOOK
P. 69

SECTION K



                                 WATERPROOFING AND ASPHALT WORK

                     Generally


               K.1  Classification of work

                     1.   Work shall be classified according to the kind of matefials and given together with its

               associated skintings, angle-fillets and labours under an appropriate heading:

                     a.   Damp proofing and tanking.
                     b.   Flooring and underay.
                     c.   Paving.
                     d.   Roofing.

               K.2   Measurement

                     1.   Particulars of the following shall be given:

                          a.    Kind and quality of material.
                          b.    Thickness and number of coats and layers.
                          c.    Nature of base.
                          d.    Surface treatment.

                     2.   Coverings shall be measured the area in contact with the base but no deduction shall be
                          made for voids not exceeding 0.50m2.

                     3.   Coverings over 300mm wide shall be given in square metres. Such work not exceeding
                          300mm wide shall be given in metres stating the width in stages of 150mm. Classification
                          shall be as follows:

                          a    Flat ooverings which shall include ooverings to falls or cross-falls and sloping
                               coverings not exceeding 10° from horizontal. Intersection on works to cross falls
                               shall be deemed to be included with the items.
                          b.   Sloping coverings over 10° but not exceeding 45° from horizontal.
                          c.   Sloping coverings over 45° from horizontal and vertical coverings (grouped
                               together).

                     4.   Coverings in isolated areas not exceeding 1.00m2 each shall be enumerated.

                     5.   Paper, felt, cork, fibreboard or other underlay in contact with waterproofing and any
                          reinforcement shall be given in the description of the work in which they occur. Cutting,
                          notching, bending and lapping the underlay and the reinforoement shall be deemed to be
                          included with the items.

                     6.   Work which will be subsequently covered shall be so described.

                     7.   Work and labours carried out overhand or in confined situations (where at least 0.60m of
                          working space cannot be provided) shall each be so described.

                     8.   Work and labours on  retaining walls, in sections, and where continuity of laying will be
                          interupted by obstructions shall each be so described. Jointing between sections shall be
                          deemed to be included with the items.




                                                           66
   64   65   66   67   68   69   70   71   72   73   74