Page 10 - Eden Meadow 35 houses application as of 12 October
P. 10

LAND TO THE REAR OF EDEN MEADOWS, NEWINGTON

                                                                     AIR QUALITY ASSESSMENT



               1.12     This assessment has been carried out to determine the potential impacts posed to future end
                        users, along with other key receptors, based on the current development. Should revisions in
                        the development proposals result in a change any assessment parameters detailed in this
                        report, a re-assessment of the impacts and associated mitigation measures should be carried
                        out.




                        Report Structure

               1.13     Chapter 2 of the report presents background information on the pollutants and legislation that
                        drives air quality strategies in the UK, with the various planning policies described in Chapter

                        3.  Chapter  4  sets  out  the  assessment  methodology  applied  for  this  specific  Air  Quality
                        Assessment at the different phases of the development including modelling scenarios and
                        sensitive receptors. Chapter 5 is the Air Quality Assessment following results of the modelled
                        pollutants including predicted concentrations. Chapter 6 relates to the proposed mitigation
                        measures that could be incorporated into the development proposes to off-set any impacts
                        that have been assessed.



















































                       Lustre Consulting Ltd
                       Report Ref.: 3143/MD/07/2020                                            Page No. 8
   5   6   7   8   9   10   11   12   13   14   15