Page 8 - Eden Meadow 35 houses application as of 12 October
P. 8

LAND TO THE REAR OF EDEN MEADOWS, NEWINGTON

                                                                     AIR QUALITY ASSESSMENT


































                                    Figure 2: Proposed Development Scheme & Site Boundary




                        Objective


               1.4      The  detailed  Air  Quality  Assessment  will  focus  on  the  potential  impacts  on  local  traffic
                        emissions once the development has been completed.  This will be undertaken by assessing
                        the potential impact of increased traffic emissions due to the development at existing and

                        proposed receptors located adjacent to the modelled road network.  The pollutants modelled
                        as part of this assessment are nitrogen oxides (NOx) and particulate matter (PM10).

               1.5      In addition to this, the assessment has also discussed ways of minimising the impacts of

                        potential poor air quality on existing receptors by way of mitigation measures, as well as
                        assessing the potential impact on local air quality from construction activities at the site.

               1.6      With the exception of updated damage cost calculations to take account of the reduction in

                        traffic movements associated with the development, the remainder of this assessment was

                       Lustre Consulting Ltd
                       Report Ref.: 3143/MD/07/2020                                            Page No. 6
   3   4   5   6   7   8   9   10   11   12   13