Page 219 - Eden Meadow 35 houses application as of 12 October
P. 219
Land to the Rear of Eden Meadows Scope
2.0 SCOPE
2.1 The overall aim of the LBMS is to promote a sensitive management approach, which protects,
manages and enhances the Site for the benefit of the users.
2.2 This document provides a strategy for overall management and maintenance of the landscape
features of the Proposed Development, including existing features, hard and soft landscape
proposals and newly created habitats including trees, hedges, shrubs, amenity and wildflower
grassland and Sustainable Drainage Systems (SuDS).
2.3 The LBMS has been prepared to provide an integrated approach to the management of the
landscape, ecology and amenities associated with the Proposed Development. It is a dynamic
document that should be renewed on a regular basis, every 5 years or sooner if required, and
amended as circumstances change with the evolving changes of the Site.
Document Structure
2.4 Section 3.0 describes the existing fauna and flora present in and around the Site, including key
species. Section 4.0 sets out the vision, aims and objectives for the LBMS, and Section 5.0
describes the Landscape Management Components and their associated maintenance tasks.
Sections 6.0 and 7.0 describe the general maintenance and management tasks, which we set
out in an annual maintenance schedule. Finally, Section 8.0 addresses the monitoring and
review of the LBMS.
27912/A5 3 March 2020