Page 3 - 3. References
P. 3

REFERENCES  3



                      Meadow Acres Storm Station   AE2S continues to provide SCADA integration and controls on all new City Water Department
               2014   SCADA Programming and    projects, including rehabilitation of lift stations, wells, and storm stations.
                      Integration

                      MicroClor Hypochlorite   The City of Burnsville transitioned from a deteriorating chlorine gas feed system to a hypochlorite
               2014   Generation and Feed System   generation/feed system.  AE2S teamed with MicroClor to create a custom SCADA controls package
                      SCADA Integration        allowing for ease of operator use and troubleshooting.

                                               AE2S teamed with the City’s IT Department to design and implement a SCADA-integrated
                                               state-of-the-art access control and security monitoring system.  The access control terminals at
                      WTP/Remote Site Access   the WTP, wells, and other associated sites have been integrated with the local programmable
               2015   Control and Intrusion SCADA   logic controllers to achieve intrusion alarming and monitoring via the City of Burnsville’s SCADA
                      Integration
                                               system.  SCADA intrusion alarming includes disable/enable functionality and remote notification,
                                               as well as on site security cameras.

                                               Project consisted of the review of as-built drawings and documentation of past
                      Heather Hills Water Storage  renovations and recent recommendations by other consultants, a thorough inspection
               2015   Tank - Inspection and    of the tank, and a report that summarized the current condition of the tank and
                      Preliminary Investigation  recommended rehabilitation.  AE2S teamed with KLM for the inspection and structural
                                               review portions of this project.


                      Water Distribution Model   Project consisted of a hydraulic model update, Unidirectional Flushing program – pilot
               2015   Update & Unidirectional   area, water distribution system field testing, hydraulic model EPS calibration, and
                      Flushing Program         pressure and fire flow analysis.


                      Pressure Management (PRV)  The project consisted of a pressure zone analysis using the water distribution model
               2015
                      Study                    and a PRV vault condition assessment and improvement plan.

                      Nicollet Reservoir       Project consisted of design and request for quotes and construction phase services
               2015   High Service Pump 4      for the rehabilitation of the high service pump, including process piping painting and
                      Rehabilitation           insulation.

                      Buck Hill Lift Station Controls   AE2S continues to provide SCADA integration and controls on all new City Water Department
               2016
                      Improvements             projects, including rehabilitation of lift stations, wells, and storm stations.

                      Skyline PRV Relocation and   The Skyline PRV is being relocated as part of a Dakota County road rehabilitation project.  AE2S is
               2016
                      Controls Improvements    working directly with the City as the project engineer and controls integrator.
                                               The City of Burnsville is constructing a new storm station in the Crystal Lake area to assist with
                                               water drainage.  AE2S is designing and implementing the electrical installation and controls for
                      Crystal Beach Storm Station   this project.  This storm station will consist of a main influent wetwell and infiltration basin
               2016   Electrical Design, Installation,   wetwell, with level instrumentation in each.  The pump controls will be based upon a comparison
                      and SCADA Integration    of the levels of both wetwells to achieve proper storm water drainage.  The Crystal Beach Storm
                                               Station is currently in preconstruction phase, and we are confident it will be another example of
                                               AE2S excellence upon its completion in early 2017.



             ADDITIONAL BURNSVILLE EXPERIENCE BY NANCY ZEIGLER WHILE AT PREVIOUS FIRM
             PROJECT

             Burnsville Well Rehabilitation Projects - Wells 1, 2, 6, 7, 9, 11, 13, and 17
             High Service Pump Rehabilitation Projects - Water Treatment Plant High Service Pump 2 and Nicollet Reservoir High Service Pump 1 and 3



                                                         AE2S BURNSVILLE TECHNICAL SPECIALTY CONSULTANT ENGINEERING SERVICES SOQ 3.3