Page 14 - EOI_LAW ARCHITECTS_SIENA COLLEGE_booklet
P. 14
28 SIENA C OLLE GE SIENA C OLLE GE 29
CAPABILITY STATEMENT CAPABILITY STATEMENT
other selected
04 Projects
holy trinity primary school tarneit rise primary school
NEW GREENFIELD SCHOOL | SUNBURY TARNEIT WEST | GREENFIELD SCHOOL
A new Catholic primary school located in the growing area of Sunbury. The project has been designed to be A new primary school with a construction budget of $10m, located on a greenfield site in the rapidly-expanding
a flexible learning environment that changes and evolves as the school grows over the coming years. Simple growth corridor of Tarneit in Melbourne’s south-west. Designated a “fast-tracked” project, the school was
construction techniques have been a key aspect to achieve the best value for a tight budget. Further to this the designed, documented and tendered within several months, calling for tight and professional co-ordination of our
use of durable materials that require low maintenance will stand the test of time. The building has various areas internal team and consultant colleagues.
that are designed to blur the line between the internal and external environment. Holy Trinity Stage 1 creates an
inviting gateway for the future development of the school. Key design priorities include highly-flexible collaborative learning areas, effective natural ventilation throughout all
buildings and crucially, an emphasis on integrating the carefully-sited buildings with the surrounding landscape and
play area scheme.
Opening in 2018 it initially accommodates 475 students, it will be able to meet further enrolment demands via the
introduction of relocatable buildings (locations of which have been incorporated into the school’s Master Plan).

