Page 40 - hp server user guide_Neat
P. 40

3.   Install the drive.
















                     4.   Determine the status of the drive from the drive LED definitions.
                     To configure arrays, see the HPE Smart Storage Administrator User Guide on the Hewlett Packard
                     Enterprise website (http://www.hpe.com/info/smartstorage/docs).

            Installing a non-hot-plug drive


                              CAUTION:   To prevent improper cooling and thermal damage, do not operate the server
                              unless all bays are populated with either a component or a blank.


                     To install the component:
                     1.   Unlock and remove the tower bezel ("Remove the tower bezel" on page 17).
                     2.   Power down the server (on page 17).
                     3.   Remove all power:
                         a.  Disconnect each power cord from the power source.
                         b.  Disconnect each power cord from the server.
                     4.   Place the server on its side.
                     5.   Remove the access panel (on page 18).
                     6.   If installed, remove the PCI air baffle (on page 20).
                     7.   Remove the system air baffle (on page 22).
                     8.   Remove the fans (on page 23).
                     9.   If already installed, disconnect the drive cables from the rear of the drives.
                     10.  Remove the non-hot-plug drive cage from the chassis:




























                                                                                      Hardware options installation  40
   35   36   37   38   39   40   41   42   43   44   45