Page 4 - Seoyoung Engineering BIM Brochure
P. 4

3D                              KEY OF BIM PROCESS




                                     3D Information Model at every stage of the design
                                     Most of the problems that can occur during construction can be detected
                                     throughout the process can be systematically integrated and managed so that
    INFORMATION                      and solved in advance by BIM. In addition, all the design information generated
                                     it can be collaborated with others completely. These eventually improve the
    MODEL                            structure`s quality and user satisfaction.



                                                                                        01. DESIGN REVIEW







































          02. QUANTITY TAKE OFF
   1   2   3   4   5   6   7   8   9