                                                                     2 ND        TECHNOLOGY

                     DEVELOPMENT AND APPLICATION                                DEVELOPMENT
               OF 4D PROCESS SIMULATION SYSTEM                                                ISSUES




                                    Construction Simulation of Culvert Passing through Railway
              Front jacking method was introduced to install culvert that pass through the lower section of the existing railway
             ( KTX ) and to enter industrial sites. For this, temporary facilities are developed with BIM and implemented with 4D
                               simulation to be utilized as decision-making data on design review and construction order.

                                                  3D Information Modeling and 4D Simulation of
                                                       Facilities for Mineral Resources Distribution
              A port railway was planned to transport minerals from mines located in Roy Hill, Australia, to adjacent ports. We
              conducted BIM and 4D simulation for plant facilities, which are for collecting, loading and transporting minerals,
                      also the facilities for loading ships. Those data were utilized in reviewing designs and decision-making.

                                                 Water Inflow Pipeline Construction ( Asan DC2 )
             About the underground pipeline system entering the industrial complex, process management was carried out by
            establishing BIM and implementing it with 4D simulation. As a result, the construction quality was increased during
                           the construction and it has been used for maintenance after the completion of the construction.