Berklee School of Music
                                  Performance Center, Classroom & Studio Renovations & Addition



































          SIZE                     OWNER
          18,000 square feet       Berklee School of Music
          CONTRACT TYPE            ARCHITECT
          Construction Manager-at-Risk  Kubitz & Pepi Architects, Inc.








                                                                       PROJECT DETAILS
          Complete gut and renovation of the existing performance center and       •   Construction was performed while the school
          retrofi t of the theatre with state-of-the-art technology. Th e 1200-  remained operational and occupied at all
          seat concert hall facility offers musicians, vocalists, and students   times.
          a professional environment in which to stage and choreograph
                                                                          •   Th  e project’s location in the heart of Boston
          performances, live stage design and live production techniques.
                                                                            required intense logistical coordination
                                                                            between Barr & Barr, the City Boston,
                                                                            local inspectional/municipal services and all
                                                                            subcontractors to maintain the safety of student,
                                                                            faculty, pedestrian and vehicular traffi  c.
                                                                          •   Major structural changes, complete with
                                                                            MEP demolition and additions, built out an
                                                                            additional classroom and music/practice
                                                                            booth within an existing center courtyard.

                                                                          •   Installation of sophisticated sound, lighting
                                                                            and stage equipment promoted the College as a
                                                                            leading performing arts center in Boston.