Kripalu Center for Yoga and Health
                                        New Housing and Assembly Hall, Stockbridge, MA



































          SIZE                     OWNER
          35,000 square feet       Kripalu Center for Yoga and
                                   Health
          CONTRACT TYPE
          Construction Manager-at-Risk  ARCHITECT
                                   Rose + Guggenheimer Studio






                                                                       PROJECT DETAILS
         The new housing and assembly hall features 80 guest rooms with       •   A high standard of sustainability was met
         private baths and is connected to the campus’ main building by way of   utilizing sliding sun screens, cast-in-place radiant
         an enclosed passage. Th  e annex is clad with “rain-screen” siding that   cooling and heating, daylighting and natural
         is made of small, square strips of untreated raw wood salvaged from   ventilation.
         the Hurricane Katrina tidal surge. Th  e siding will be allowed to age
                                                                          •   Rigorous, creative value management reviews
         naturally, gradually taking on the grays of mature wood to blend in
                                                                           during fi nal design development identifi ed
         with the countryside.
                                                                           appealing lower-cost alternatives that kept the
                                                                           project on budget and ahead of schedule without
                                                                           compromising quality.
                                                                          •   Minimized disruptions to adjacent guest living
                                                                           quarters through in-depth preconstruction
                                                                           logistics planning.