Page 427 - Six Sigma Advanced Tools for Black Belts and Master Black Belts
P. 427

...
 JWBK119-IND
                                           Index
        412  August 31, 2006  3:10  Char Count= 0
        rank-ordering, 165                      process improvement, 32
        rational subgroups, 76                  roadmap, 4--5, 52, 54
        regression:                           skewness, 107--115, 128--129, 135--137, 141,
          analysis, 13, 50, 53, 156--163, 223, 225, 357  143, 146--148, 163, 167, 169, 217, 219
          model, 155, 181--192                solver, 207, 307--308, 310, 320
        reliability engineering, 36, 38, 221, 230, 257,  specification limit, 132--133, 135, 141--142,
            306                                   145, 196--198, 201, 226, 250, 279, 394
        repeatability, 75, 226, 282           standard deviation, 76--77, 79, 108, 198,
        replicate, 15, 79, 116, 203, 208, 239, 246,  252--253, 307--310, 312
            251--255, 299, 307, 311, 315, 318--319, 375,  standard errors, 233
            379, 388, 395                     standard normal distribution, 113, 134, 169,
        replication, 45, 290, 298, 304            214
          unreplication, 399                  stationary process, 393
        reproducibility, 75, 226              Statistical process control (SPC), 21--23, 50,
        residual, 111, 138, 155--162, 165--166, 174--178,  53, 57, 269, 271, 344, 353--354, 358, 360,
            185--186, 231--232, 239, 243--244, 344, 347,  362--363, 382, 384, 386, 391, 393, 404
            353--355, 364--366, 382, 395, 401--402, 404  statistical control, 32, 75, 205, 221, 328, 330,
        residual analysis, 231, 239, 243          355
        residual control charts, 354          statistical hypothesis, see hypothesis
        risk, 42, 44--45, 53, 57, 153--154, 173, 178--180,  statistical inference, 172, 178, 181, 257, 290
            189, 327, 331, 373                statistical model, 153--154, 171--172
        roadmap, 3--5, 8, 41--57              statistical tests, 132, 174
        robust process, 57                    subgroup, 76, 243, 253--254
        robustization, 280                    suboptimization, 28, 94
        robustness, 14, 23, 61, 113, 129, 154, 278--280,  SWOT Analysis, 31--38
            290--291                          symmetric, 83, 136, 167, 213, 387--389, 404
        Root cause analysis (RCA), 62, 101--104
        run chart, 53, 57                     T
                                              t-test, 290
        S                                     tabular, 173, 371--376, 378--379, 381, 404
        safety, 42, 258                       tabular cusum, 372, 374--375
        sample:                               taguchi methods, 33, 257, 261, 264, 267--268,
          size, 46--47, 110, 113, 127, 129, 135, 158, 196,  272--292
            198, 208, 226, 325--329, 334, 336, 338, 357  taguchi orthogonal array, 260--261
          standard deviation, 77, 79, 252--253  test statistic, 155, 161--162, 167, 169, 216, 219,
          variance, 77, 196, 252                  354, 357, 385, 391
        sampling distribution, 113, 179, 181, 196, 358,  Theory of constraints (TOC), 93, 104
            363                               three-parameter, 137, 139--140, 143, 145--148
        saturation, 224, 226--228, 230        three-sigma, 212
        scatterplots, 189                     threshold, 131, 137, 139--140, 144--148,
        screening, 47, 62--64, 141, 246, 263--264,  371--372, 374, 386
            289--290                          time series graph, 53
        screening experiment, 47, 263--264    time series model, 353--354, 354
        sensitivity analysis, 45--47, 52--54, 59--64, 155,  time-censored, 46
            175, 212, 214, 219, 221, 225, 235, 278, 308,  tolerance:
            313, 315--316, 318, 320, 328, 332, 343,  bilateral tolerance limits, 196
            346--347, 348                       design, 54
        sequential experimentation, 258, 290, 298  graphical tolerance box, 197
        sequential sampling, 331                settings in Optimize phase, 45--46
        Shapiro Wilk tests, 165                 single tolerance limit, 114, 196
        Shewhart control chart (SCC), 216, 220, 344,  tolerance intervals, 109--128
            346, 348, 354, 371, 379             via Monte Carlo simulation, 45
        signal-to-noise, 276, 284, 307        toolbox, 85--86
        six sigma:                            total quality management (TQM), 4, 33, 35--36
          organization, 7                     transformation, 111, 115, 127
   422   423   424   425   426   427   428