Page 68 - Six Sigma Advanced Tools for Black Belts and Master Black Belts
P. 68

OTE/SPH
 OTE/SPH
                               Char Count= 0
                         2:55
          August 31, 2006
 JWBK119-05
                       A New Roadmap for Six Sigma Black Belt Training        53
      Table 5.1 An expanded list of Six Sigma tools.
                Manufacturing/operational
                environment                     Transactional Environment
      Define    Project selection               Project selection
                Probabilistic risk thinking and  Probabilistic risk thinking and
                  strategic planning              strategic planning
                Decision analysis               Decision analysis
                Process mapping                 Process mapping
                Project management tools        Project management tools
      Measure   QFD and Kano analysis           QFD and Kano analysis
                                                Gap analysis
                Sampling (data quantity and data  Sampling (data quantity and data
                  quality)                        quality)
                Measurement system analysis     Measurement system analysis
                SPC Part I (concepts, implications of
                  instability)
                                                Run charts (or time series graphs)
                Capability analysis             Capability analysis
                Monte Carlo simulation and
                  statistical distributions
      Analyze   Basic graphical improvement tools  Basic graphical improvement tools
                FMEA                            FMEA
                Hypothesis testing              Hypothesis testing
                Confidence intervals
                ANOVA                           ANOVA
                Correlation and regression analysis  Correlation and regression analysis
                Reliability models and measures
                                                Cost analysis
                                                Forecasting
                                                Basic queuing systems
                                                Simulation and modeling
      Improve   DOE (factorial, fractional factorial,  DOE (factorial, fractional factorial
                  blocking, nested and RSM)       and blocking)
                Robust design
                                                Optimization and control of queues
                                                Mathematical programming
                                                  techniques
                                                Heuristics
                Sensitivity analysis            Sensitivity analysis
      Control   Mistake proofing                Mistake proofing
                Validation testing              Validation testing
                Control plans                   Control plans
                SPC Part II: Control charts     Basic control charts


      programming, nonlinear programming, network programming, dynamic program-
      ming, goal programming, multiobjective mathematical programming, and stochastic
      programming. Problems selected for Six Sigma projects are not limited to the field
      of engineering but cover quality issues in transactional, commercial and financial ar-
                                                      8
      eas as well, with an explicit and strong customer focus. Mathematical programming
   63   64   65   66   67   68   69   70   71   72   73