• Submission of proposal document and indicative pricing for review.
• Accompanied visit to Steps rehabilitation to see a completed site example.
• Derby House initial exploratory Site visit
• Formal Reval quotation issued based on indicative pricing and taking into
Project Proposal
account if there are any additional requirements/cost variations.
• Project drawing plans to be provided for review and submited to the Reval
manufacturing plant for CADS to be produced
• Formal Site visit with all parties present to sign off final pool design and
Design and Layout layout
Approvals • Site specific RAMS to be produced and issued by Reval manufacturing
• Pool Delivery and equipment cover
Phase 1 - Supply
and Delivery
• Plant installation and Commissioning
• Removal of temporary pool cover
Phase 2 - • Install plant equipment and test
Installation and • Commissioning of the pool
Commission
• Handover and Operational Training
• Site Specific O&M manuals issued
Phase 3 - Building
completion
Reval Continuing Care Ltd
Unit 17 Brynmenyn Business Centre, St Theodore’s Way, Brynmenyn Industrial Estate, Bridgend, CF32 9TZ
Tel: 01656 721001 Fax: 01656 720006 www.revalcc.co.uk sales@revalcc.com
VAT No. 826 8233 17