Page 30 - PowerPoint Presentation
P. 30

Melrose Park Employees of the Month

























                       B & F
                    Engineering
                                                               Procurement                                        Joe D.
                                                                  Team                                           Driver
       The B&F Engineering team is recognized
       for their efforts in keeping everyone safe
       this past winter. During times of extreme   The entire Procurement team took it to a new   John D. is a driver and spotter in the yard, but his
       cold and below zero temps the team        level for the Lenten season by working to     primary responsibility is maintaining  the daily
       worked to remove snow and ice from the    source fresh salmon from Chile and fresh tilapia   temperature records of our refrigerated and
       Melrose Park complex.                     from Costa Rica for the one day sale.         frozen loads. He routinely monitors the temperature of
                                                 Jewel-Osco finished 9.5% over last year’s one   all the perishable and frozen trailers to ensure that they
                                                 day sale with salmon and tilapia just a small   are set correctly and operating properly. On several
       Also applying salt in the parking lots, truck   part of this record setting sales day.
       drive drives, loading and receiving docks,   Lobster tails, shrimp, crab legs, scallops and   occasions, due to his level of awareness and attention to
       and pedestrian walkways. Congratulations   even “fake meat burgers and sausage” led to   detail, John has caught and reported issues with trailers
       to the B&F engineers for a successful team   the overall success!                       that have resulted in saving a potentially lost load.
                                                                                               In addition, John has a good working relationship with
       effort, and thank you!                    Thank you for all you do !                    his fellow drivers, the supervisors along with a positive
                                                                                               attitude and a good sense of humor.
       Pictured (l-r) Engineer Alonso C., Engineer  Pictured (l-r) Buyer James P., Procurement
       Sophan B., Lead Engineer George M. and    Mgr. Jeff C., Buyer Mark C., Buyer Adam P.,   We thank John for his strong efforts, hard work and a
                                                                                               consistent job well done.
       Engineer Joe F.                           Dept. Specialist Pat S., Buyer Kyle R.                                               30
   25   26   27   28   29   30   31   32   33   34   35