e-Gopang EV Charging Station Solution – Battery 2 nd Life Redesigning energy on earth
Max 74kW from Grid
Use constant Grid Power
250kWp
Compact (1/3 in size) • 30% out of total Load power is supplied
from Grid power constantly
220kWh
• Load balance by EVC fleets control
Power supply to anywhere
Power supply to anywhere
• Concert or exhibition requires peak power
during concert show time.
aux • The ESS is charged by renewable energy
50kW and can provide peak power to visual lights
and audio system in concert show
• Replacing Diesel Generator with ESS to
Temp, Humid issue free reduce CO2 and Noise, Stinks
Max 250kW Load
• Supplying Peak power to a building which is
not able to increase input grid power
• All-in-one system with independent operation with maximum power of 250kW is composed of 3 fast chargers and 5
standard chargers • ESS rental service for peak load reduction for
the air conditioner in apartment in Summer.
• Collected reusable EV Batteries are available to use with range from 220kWh to 440kWh and this charging station use
74kW constant Grid power for ESS 185kW and external output 50kW
• Charge ESS when EVCs are idle, discharge when EVCs busy. And if the battery is running out, 74kW limited grid power
will supply to chargers