Page 4 - FQ10493.Morgan-KirkmanInc.Greensboro.NC.DC15000G (Gravity Drain)
P. 4
Page No. 3
Proposal No. Q10493
Date: May 3, 2017
5. Prepiped and Prewired pilot gas train assembly including:
5.1 Pilot solenoid valve.
5.2 Pilot pressure regulator.
5.3 Pilot shutoff valve.
5.4 Spark ignition assembly.
5.5 Stable blast flame assembly.
6. System mounted U. L. control panel including:
6.1 NEMA-1 Enclosure.
6.2 Electronic temperature controller.
6.3 Three (3) flush mounted digital thermometers indicating inlet water,
outlet water and stack temperatures.
6.4 Indicator light display panel.
6.5 Audible alarm for water status (Bell).
6.6 Numbered terminal strip for each of hook-up.
7. Microprocessor based burner management control system (U.L. Listed)
including:
7.1 Flame monitor.
7.2 U.V. flame scanner.
7.3 Diagnostic status display.
7.4 Burner control panel.
7.5 Audible alarm of burner status (Siren).
8. Full modulation control system including:
8.1 Temperature sensors.
8.2 Modulating drive motor.
9. One (1) sight glass to view combustion.
One (1) Water Level Control Sensor Assembly Including:
1. Five (5) level sensing probes.
2. One (1) set of gauge cocks with plastic sight glass.
3. Water wall level sensor.
One (1) Water Flow Rate Assembly Including:
1. One (1) pressure gauge. (Setting rate).
2. One (1) pressure actuated switch. (Confirm flow and initiate firing).